
3.3M
project value
10K
area (m²)
380
length (m)
6
sports fields




Barcola Sport Citadel
Trieste
Thanks to funding from the PNRR (National Recovery and Resilience Plan) under Mission 5, “Inclusion and Cohesion,” an area of the Old Port of Trieste is undergoing urban regeneration with the creation of the Barcola Sports Citadel, approximately 10,000 square meters of new, multifunctional public space dedicated to sports, leisure, and social interaction. The project, designed by meg.studio, restores a neglected area to the city, transforming it into an open and inclusive space where new structures integrate with the landscape while honoring its historical legacy. The site will feature tennis courts, basketball courts, beach volleyball courts, a skatepark, and supporting amenities to ensure a comprehensive experience. A distinctive element of the design is the use of curved, prefabricated HPRC (High-Performance Reinforced Concrete) structures, resembling “waves”, positioned around the sports courts and gathering areas. These sinuous, informal, and multifunctional spaces are designed for lounging, playing, and relaxing, offering users the freedom to define how they wish to use them.
Year 2023 - 2025
Client Trieste Municipality
Scope of work Definitive design; Executive design
Credits Mountech Srl Stp | systems; Arch. Gianluca Paron | architecture; Castellari Ambiente Srl Stp | geology; Mari & Mazzarolli | lead contractor (RTI); Rosso Srl | contractor (RTI); BTrend FVG | contractor (RTI); Prefab | prefabricated modules and cladding; Lab23 Street Furniture | 'Waves' modules; Neri Spa | architectural lighting; Eng. Flavio Chianese, Municipality of Trieste | photography