
3.7M
project value
80
length (m)
8,50
platform width (m)
11.900
excavation volume (m³)




New bridge and infrastructure at Lake Barcis
Barcis, Pordenone
Meg.studio led the design of a strategic alternative road network on the right bank of Lake Barcis. This intervention was essential to restoring the hydraulic efficiency of the Cellina torrent and its tributaries, which had been compromised by significant gravel accumulation. The project plays a vital role in securing the basin and protecting the valley's delicate environmental balance.
Meg.studio focussed on structural reinforcements, innovative bridge launching techniques, and the optimization of reinforced soil structures at the Antoi and Arco bridge sites. The entire project was built upon a rigorous 3D georeferenced model of the territory. Beyond engineering, the project enhances the local landscape: a dedicated cycling and pedestrian path ensures safe transit for all users, while redesigned green spaces and a new panoramic terrace offer breathtaking views of the lake.
A hallmark of this project is the commitment to the ENVISION Protocol. Aiming for high-level certification, meg.studio managed the entire process through a structured framework of sustainability audits, ensuring the infrastructure meets the highest international environmental standards.
Year 2019 - 2021
Client ICI.Coop Scrl (on behalf of FVG Strade Spa)
Scope of work Executive design; Technical improvements