
202M
project value
1067
length (m)
160k
concrete (tonnes)
19
spans




Presentation of the Launch Sequences of the San Giorgio Viaduct over the Polcevera
Genoa
Meg.studio produced an educational video to illustrate the installation method for the metallic deck of the new Genoa Bridge over the Polcevera. Based on BIM models of the metallic decks developed with Tekla Structures, an animated 3D simulation was created and rendered with Cinema 4D, designed to make the installation operations clear and understandable to both industry professionals and citizens.
Tekla Structures, a BIM-based design software, enabled the creation of a highly accurate model of the new Genoa San Giorgio Bridge, making it possible to optimise both production processes and the entire workflow. The video was completed in just seven days and was presented at the official inauguration ceremony marking the start of works in Genoa.
Year 2019
Client Fincantieri Infrastructure Spa
Scope of work Modeling; Rendering; Educational video editing